New TopShim run:

version = topshim 2.0.0
date = 2024-10-21
time = 16:44:26.597
command = topshim 

FINE SHIMMING

Parameters:

probe = Z114607_0045
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 1.1 Hz, Target= 0.3 Hz, After= 1.5 Hz
echo time must be reduced
Iteration  2: FWHM Before= 1.5 Hz, Target= 0.2 Hz, After= 1.6 Hz
Iteration  3: FWHM Before= 1.6 Hz, Target= 0.7 Hz, After= 0.8 Hz
Iteration  4: FWHM Before= 0.8 Hz, Target= 0.3 Hz, After= 1.1 Hz
Iteration  5: FWHM Before= 1.1 Hz, Target= 0.3 Hz, After= 0.6 Hz
Iteration  6: FWHM Before= 0.6 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  7: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.489

shim changes: 
Z	+546
Z2	-257
Z3	+453
Z4	-2174
Z5	+1453
Z6	-4144
Z7	+11403
Z8	-5369

duration = 3 min 42 sec
completed successfully
finished Mon Oct 21 16:48:07 2024


========================================================================